Why a Water Plant Is Hard on a Transformer The aeration blowers in one plant we quoted last year ran fine for nine months and then started tripping the same breaker every afternoon. The blowers were not the problem. Neither was the drive. The water t...
VIEW MORE
A transformer can be built exactly to spec, pass every factory test, and still sit on its concrete pad with nobody allowed to energize it. In Canada, what decides that outcome is not whether the unit works. It is whether the provincial inspector acce...
VIEW MORE
A ground handler in Southeast Asia replaced 24 diesel baggage tractors with electric units and plugged them into a charging group fed from the apron substation. One season later the 1,000 kVA airport transformer in that substation ran hotter at night...
VIEW MORE
With the highly competitive industrial market these days, any dollar saved translates to a dollar increase in profit. One of the largest, yet underutilized, cost saving opportunities is the electrical distribution system, but plant managers don't usu...
VIEW MORE
A grinding station in West Africa asked us to re-quote an 8 MVA unit last quarter. The original cement plant transformer had been ordered off the mill’s running load, and for eleven months it had been dropping the bus voltage far enough on ever...
VIEW MORE
An EPC contractor in the Gulf sent us a specification in June for three 110 kV substation transformer units. Voltage, rating, frequency and impedance were all listed. The temperature rise column was blank, the site ambient was written as 50 C, and th...
VIEW MORE
The last piece of equipment between a substation and a household is an oil immersed distribution transformer — usually a 25 to 200 kVA unit on a pole or a concrete plinth, ordered in batches of fifty rather than one at a time. On 16 June 2026, ...
VIEW MORE
The Question That Arrives at 4 AM The call arrives when a unit is already down. A 5 MVA transformer trips at 4 AM, the crew opens the tank and finds a failed winding or a burned diverter switch, and the first question on the bridge is always ...
VIEW MORE
A utility foreman in southern Luzon emailed us a photograph last August of an installation that looked perfectly normal on the day it was signed off: a 13.8 kV pad-mounted transformer, a new polymer arrester on its bracket, fresh paint. Two details w...
VIEW MORE
A commissioning engineer in Riyadh sent us a photograph last August: an oil temperature gauge sitting in the red for the third hour, beside a shade thermometer reading 47°C. The transformer had been ordered against a 40°C ambient design, and ...
VIEW MORE
A commissioning engineer in Riyadh sent us a photograph last August: an oil temperature gauge sitting in the red for the third hour, beside a shade thermometer reading 47°C. The transformer had been ordered against a 40°C ambient design, and ...
VIEW MORE
Autotransformer vs Isolation Transformer: The Question Behind Half Our Sizing Emails A panel shop in Texas sent us a one-line diagram last April with a single line of text above it: "600 V service, 480 V motor load, roughly 400 hp. Do we reall...
VIEW MORE