SHENERGY Xinjiang Tacheng Hoboksar County 2GW Photovoltaic Project

Oct.13.2025

The total installed capacity of the project is 2 million kilowatts, among which the DC-side installed capacity is 616.07 MWp and the AC-side installed capacity is 498.9 MW. The project adopts the "photovoltaic + ecological management" model and utilizes desertified land resources to develop green energy. The annual power generation on the DC side of the project is expected to be approximately 800 million kilowatt-hours, with an annual reduction of 600,000 tons of carbon dioxide emissions.

  • pic.jpg
  • pic.png

Jiangsu Ryan Electric Co., Ltd. has provided Compact Prefabricated Substations with a total capacity of 1998 MVA (equivalent to 1.998 GVA). These substations are equipped with oil-immersed transformers, featuring a primary side voltage of 36.5 kV and a secondary side voltage of 0.8 kV, which comply with IEEE/IEC standards.

  • pic.jpg
  • pic.jpg

RELATED PRODUCT

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000