Two quotes for the same 1,500 kVA pad-mounted unit landed on a buyer's desk in Houston last month. Same kVA, same 13.8 kV delta to 480Y/277 V, same 95 kV BIL, same UL listing. Nineteen percent apart on price, and eight weeks apart on delivery. We ask...
VIEW MORE
The purchase of substation transformers in power grid construction is actually critical choice. The transformer is the most important component in a substation and when it fails, it can lead to outages, safety issues and expensive project delays. Rya...
VIEW MORE
Last spring an integrator in Apodaca took delivery of a 1,000 kVA pad-mounted unit for a new industrial park outside Monterrey. The transformer arrived on schedule, passed every factory test, and then sat in a bonded warehouse for nineteen days. The ...
VIEW MORE
The most expensive line in a transformer purchase is not the price. It is the purchase order signed after a video tour, a PDF catalogue, and three reference photos that later turn out to belong to somebody else's plant. We have watched buyers audit a...
VIEW MORE
A school campus in southern Ontario removed its gas boilers in the summer of 2026 and replaced them with 420 kW of air-source heat pumps. The mechanical engineer sized the compressors correctly. The electrical package still failed on the first cold m...
VIEW MORE
A crew in central Oklahoma opened a pad-mounted unit last November that had tripped its feeder twice in one week. The transformer was healthy. A squirrel had bridged the high-voltage bushings, flashed over, and left a carbon track that re-struck on ...
VIEW MORE
Four halls at 60 MW each, a utility that offers 13.8 kV because that is the line already running past the site, and a switchgear package ordered before anyone ran the fault calculation. Six months later the lineup no longer fits the electrical room, ...
VIEW MORE
A platform contractor once sent us a 132 kV export unit specification with ninety pages of electrical requirements and one line about transport: maximum lift weight, 240 tonnes. Our first design weighed 262 tonnes oil-filled. We rebuilt the tank, spl...
VIEW MORE
Dry-type and oil-immersed transformers are not actually just a matter of preference for indoor power projects, data centers, industrial plants, commercial complexes, and substations. Safety, code-compliance, and fire-protection decisions will be scru...
VIEW MORE
For dry type transformers in commercial, data center or substation applications, procurement teams need to look at much more than the first cost of the transformer. Ryan Electric, a joint venture with Eaton (USA), provides transformer solutions that ...
VIEW MORE
Last December an EPC contractor in the Gulf sent us a specification for six 13.8 kV units feeding refrigerant compressor drives on a liquefaction train. The kVA was there, the impedance was there, and the paint system was described in three w...
VIEW MORE
As a pad mounted transformer manufacturer, we keep meeting the same failure in the same order. A pad mounted unit is switched out for maintenance. The riser pole arrester at the end of the cable fails. The crew replaces the arrester, energize...
VIEW MORE